Completed work
- Installation of external water supply and sewerage networks (digging, installation of low-pressure polyethylene pipes and reinforced concrete wells)
— Household drinking water supply - total length is 1885 r.m.
— Fire-fighting water supply - total length is 700 r.m.
— Rain sewer - total length is 1284 r.m. - A wide range of work has been completed (installation and strapping of equipment, automation, and commissioning) in the sanitary inspection's boiler room.
- Work has been completed (installation and commissioning) in the gas pollution control systems of the sanitary inspection and 12 poultry houses.