    Farm Сomplex for Tambov Turkey (Cherkizovo Group)

    Project description

    A wide range of work has been implemented on internal and external networks (water supply, sewerage).

    Object parameters

    Customer: Cherkizovo Group
    Implementation year: 2019
    Time frame: 8 months

    I-II in queue
    September 2019 — May 2020
    Completed work
    1. Installation of external water supply and sewerage networks (digging, installation of low-pressure polyethylene pipes and reinforced concrete wells)
      — Household drinking water supply - total length is 1885 r.m.
      — Fire-fighting water supply - total length is 700 r.m.
      — Rain sewer - total length is 1284 r.m.
    2. A wide range of work has been completed (installation and strapping of equipment, automation, and commissioning) in the sanitary inspection's boiler room.
    3. Work has been completed (installation and commissioning) in the gas pollution control systems of the sanitary inspection and 12 poultry houses.
    III in queue
    May 2020 — December 2020
    Completed work
    1. Installation of external water supply and sewerage networks (digging, installation of low-pressure polyethylene pipes, reinforced concrete wells and trays):
      — Household drinking water supply - total length is 1760 r.m.
      — Fire-fighting water supply - total length is 697 r.m.
      — Rain sewer - total length is 540 r.m.
      — Rain sewer’s reinforced concrete trays - total length is 984 r.m.
    2. A wide range of work has been completed (installation and strapping of equipment, automation, and commissioning) in the sanitary inspection's boiler room.
    3. List of work has been made (installation and commissioning) in the gas pollution control systems of the sanitary inspection and 12 poultry houses.
    4. A wide range of work has been completed on the installation of the on-site low-pressure gas pipeline (installation of low-pressure polyethylene/steel gas pipeline, installation, and strapping of gas control point cabinet):
      — The total length of the underground gas pipeline (low-pressure polyethylene pipe) — 696 r.m.
      — The total length of the above-ground gas pipeline (steel pipe) - f108mm 1824.4 r.m.; f20mm - 2261.6 r.m.
    5. A wide range of work has been made on the installation of external power supply networks and site lighting (installation of reinforced concrete supports, self-supporting insulated wire-line, and lamps, assembly and installation of input and distribution device cabinets, grounding of 12 poultry houses, disconnection, and installation of complete transformer substations, commissioning).
    6. The modular water treatment container was delivered and strapped
    Other projects
    Installation of heating systems and heat supply, ventilation of industrial premises, administrative and household complexes, checkpoints, pumping stations, complete transformer substations, switchboards, and compressors.
    Go to a project
    Reconstruction of a sausage factory producing 80 tons of salami daily in the Topkanovo village, Kashirsky district, Moscow region
    Go to a project
    Construction of two refrigerating chambers (sizes 1560 m³ and 3470 m³) on a turn-key-basis
    Go to a project