    Construction of Refrigerating Chambers at the PROGRESS Factory

    Project description

    Construction of two refrigerating chambers (sizes 1560 m³ and 3470 m³) on a turn-key-basis

    Object parameters

    Customer: Juice and Baby Food PROGRESS Factory
    Implementation year: 2016
    Time frame: 5 months

    Refrigerating chambers sizes 1560 m³ and 3470 m³
    January 2016 — June 2016
    Completed work

    The project was implemented on a turn-key-basis using the company’s workforce and funds:

    1. Project work. Labor documentation.
    2. Project expertise.
    3. Delivery of OSTROV refrigerating equipment.
    4. Supply and install metal structures, sandwich panels, automatic gates, and fast lifting curtains.
    5. Lighting inside the cameras.
    6. The power section on the equipment.
    7. Vandal-proof bumpers around the cameras.
    8. Equipment frames on the roof of the building.
    9. Drainage system with heating.
    10. The entire complex of commissioning work.
    11. Subsequent maintenance.

    Distinctive project features:

    • Non-stop production
    • 24/7 operation
    • Extremely tight deadlines
    Other projects
    Construction of a two-story 546 m² sewage treatment building, and an averaging tank, with 236.1 m³ volume of concrete work.
    Go to a project
    Construction work, ventilated facade based on composite materials, electrics and sewerage installations, landscaping.
    Go to a project
    Installation of heating systems and heat supply, ventilation of industrial premises, administrative and household complexes, checkpoints, pumping stations, complete transformer substations, switchboards, and compressors.
    Go to a project