Completed work
                        - Installation of metal structures and sandwich panels of newly erected galleries on the roof of the building
 - Installation of self-supporting refrigerating chambers made of SIP panels with 80-250 mm thickness. The total volume of the mounted sandwich panel is more than 15,000 m².
 - Installation of the total volume of general exchange ventilation, smoke removal, and heating systems.
 - The building of local treatment facilities – all engineering networks except for technological equipment.